Photo of the main floor slab with covers

Main Slab Curing

Seven weeks after pouring the footings, the main floor slab has been laid, and the formwork removed. The slab is supported by double brick foundation walls, both at the perimeter and beneath future internal brick walls. Polystyrene insulation has been placed vertically along the inside face of perimeter foundation walls from the footings up to the slab.